New suites, bedrooms, bars and rooftop terrace for a live city-centre hotel
A £10m live hotel expansion at Treehouse Manchester, adding 9 suites, 56 bedrooms, two bars, a restaurant and a rooftop terrace across the upper floors of an operational city-centre hotel. We managed constrained access, live hotel logistics, detailed design coordination and an integrated M&E package around guests and daily hotel operations.

Hospitality
Live hotel
Integrated M&E
Complex logistics

What we did
Mountain Earth was appointed to deliver a £10m expansion at Treehouse Manchester, adding 9 suites, 56 bedrooms, two bars, a restaurant and a rooftop terrace across the upper floors of a fully operational city-centre hotel.
The hotel’s deliveries, laundry, food and waste all used the same single access point and hoist as our site team, so every site movement had to be planned around them.
Key focus areas:
We delivered a complex hotel expansion in a live setting, bringing fit-out, M&E design and upper-floor logistics together while the hotel kept trading below. The new bars, restaurant, rooms and suites extend the Treehouse guest offer with spaces that match the character of the wider hotel, and show what Mountain Earth’s integrated construction and M&E model can do where access, live operations and finish standards all overlap.
“Mountain Earth have managed our project with professionalism, clear communication and strong attention to detail. The works have taken place in a live hotel environment, with complex access, operational requirements and design coordination to manage throughout. Their team have worked closely with us to keep decisions moving, protect hotel operations and maintain the quality expected of the Treehouse brand.”